Case study · Parks and recreation

Duckweed cleared from a council pond at Gough Park, Cecil Hills

Cecil Hills, New South Wales

Long-standing duckweed cleared in 6 weeks

Client
Local council, Gough Park
Location
Cecil Hills, New South Wales
Sector
Parks and recreation
Water body
Stormwater-fed park pond
Installed
10 × PBE blocks plus 2 kg live Bacillus bacteria
Duckweed covering the pond
Before: duckweed across the pond.
The pond with clear open water
After: six weeks after 10 PBE blocks and 2 kg of live Bacillus bacteria.

The challenge

The pond at Gough Park had a long-term duckweed problem that the council had never managed to clear. It is fed by stormwater run-off, so every rain event brings in nutrients and other unwanted inputs that feed the duckweed and keep it spreading out of control.

Our solution

This was a biological treatment rather than ultrasound. We placed 10 PBE (Prebiotic Bacteria Enhancer) blocks in the pond and introduced 2 kg of live Bacillus bacteria to kick-start their growth, so the bacteria could outcompete the duckweed for nutrients.

The results

  • Duckweed cleared within 6 weeks of treatment.
  • No chemicals used.
  • Before-and-after photos on record; the page gives no laboratory figures.

Only a short summary of this project is published here. Ask us for the full report and the data behind it.