Duckweed cleared from a council pond at Gough Park, Cecil Hills
Cecil Hills, New South Wales
Long-standing duckweed cleared in 6 weeks
- Client
- Local council, Gough Park
- Location
- Cecil Hills, New South Wales
- Sector
- Parks and recreation
- Water body
- Stormwater-fed park pond
- Installed
- 10 × PBE blocks plus 2 kg live Bacillus bacteria


The challenge
The pond at Gough Park had a long-term duckweed problem that the council had never managed to clear. It is fed by stormwater run-off, so every rain event brings in nutrients and other unwanted inputs that feed the duckweed and keep it spreading out of control.
Our solution
This was a biological treatment rather than ultrasound. We placed 10 PBE (Prebiotic Bacteria Enhancer) blocks in the pond and introduced 2 kg of live Bacillus bacteria to kick-start their growth, so the bacteria could outcompete the duckweed for nutrients.
The results
- Duckweed cleared within 6 weeks of treatment.
- No chemicals used.
- Before-and-after photos on record; the page gives no laboratory figures.
Only a short summary of this project is published here. Ask us for the full report and the data behind it.
More of our projects

Agriculture · Victoria
Carr Farming, poultry
75% less coagulant used
Algae Control AustraliaRead →
Recreation · Harrietville, Victoria
Department of Energy, Environment and Climate Action (DEECA)
100% reduction in toxic cyanobacteria
Algae Control AustraliaRead →
Sport and recreation · New South Wales
Undisclosed Olympic training and competition centre
9 monitored units across 2 water bodies
Algae Control AustraliaRead →
Results from our US partner
A site like this one?
Tell us about your water body and we will show you what we would do, and what we would measure.




